Executed Services
- Client is operating Senegal oldest and largest Phosphate Mine. under investing in order to increase the mine’s output capacity
- Two additional deep wells with high yields were awarded to BAUER, to serve the mine’s phosphate extraction process.
Characteristics / Technical Data
- Well design with 14" pump chamber (steel) and 6" lost liner section (stainless steel)
- 2 ea. Boreholes with direct-flush and airlift drilling methods
- Ø 26" (660 mm) to 12 m
- Ø 23" (584 mm) to 90 m
- Ø 17-1/2" (444 mm) to 130 m
- Ø 12-1/4" (311 mm) to 450 m
Rigs: 1 x RB40